R20-009 1 RESOLUTION NO. R20-009
2
3 A RESOLUTION OF THE CITY OF BOYNTON BEACH,
4 FLORIDA, APPROVING AND AUTHORIZING THE CITY
5 MANAGER TO SIGN THE DEVELOPER'S AGREEMENT WITH
6 EDIN MECHANOVIC OF 820 BAMBOO LANE FOR THE
7 CONSTRUCTION OF WASTEWATER IMPROVEMENTS
8 WITHIN THE RIGHT-OF-WAY OF BAMBOO LANE; AND
9 PROVIDING AN EFFECTIVE DATE.
0
1 WHEREAS, Bamboo Lane is located east of Federal Highway adjacent to the
2 Intracoastal Waterway outside of the City limits in unincorporated Palm Beach County; and
3 WHEREAS, the City currently has a utility easement and an existing water main on
4 Bamboo Lane; however there are no existing sewer utilities on Bamboo Lane; and
5 WHEREAS,the lack of sewer service makes property improvements difficult for the
6 construction of new homes and additions; and
7 WHEREAS, the residents of Bamboo Lane will receive an improved level of service
8 and improved reliability and quality of service by connecting to City sewer; and
9 WHEREAS,the City Commission has determined that it is in the best interests of the
.0 residents of the City to approve and authorize the City Manager to sign a Developer's
1 Agreement with Edin Mechanovic of 820 Bamboo Lane for the construction of wastewater
2 improvements within the right-of-way of Bamboo Lane.
3 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF
4 THE CITY OF BOYNTON BEACH,FLORIDA,THAT:
5 Section 1. The foregoing "Whereas" clauses are hereby ratified and confirmed as
6 being true and correct and are hereby made a specific part of this Resolution upon adoption
7 hereof.
.8 Section 2. The City Commission does hereby approve and authorize the City
S:\CA\RESO\Agreements\Developers Agreement with Edin Mechanovic(820 Bamboo Ln)-Reso.docx
29 Manager to sign a Developer's Agreement with Edin Mechanovic of 820 Bamboo Lane for
30 the construction of wastewater improvements within the right-of-way of Bamboo Lane,a copy
31 of which is attached hereto as Exhibit"A".
32 Section 4. This Resolution shall become effective immediately upon passage.
33
34 PASSED AND ADOPTED this(2� day of January, 2020.
35
36 CITY OF BOYNTON BEACH,FLORIDA
37 YES NO
38
39 Mayor—Steven B. Grant ✓'
40
41 Vice Mayor—Justin Katz
42
43 Commissioner—Mack McCray
44
45 Commissioner—Christina L. Romelus
46
47 Commissioner—Ty Penserga
48
49 VOTE SC
90 ATTEST:
91
92
9 3
54 Cr tal Gibson, MMC
95 City Clerk
96
97
98 (Corporate Seal)
s-... . C •
•
S:\CA\RESO\Agreements\Developers Agreement with Edm Mechanovic(B20 Bamboo In)-Reso.docx
DEVELOPER'S AGREEMENT
THIS DEVELOPER'S AGREEMENT (the "Agreement") is made as of
1 wrc�. S, , 2020, by and between the CITY OF BOYNTON BEACH, a Florida
municipal corporation (the "City") whose address is 3301 Quantum Boulevard, Boynton Beach,
Florida 33426 and EDIN MEHANOVIC ("Owner") whose address is 820 Bamboo Lane, Delray
Beach, Florida 33483.
RECITALS:
A. Mr. Edin Mehanovic is the owner of that certain real property(820 Bamboo Lane)
as shown on the project plans; and
B. Owner intends to install low-pressure wastewater collection system improvements
within the right-of-way of Bamboo Lane, which is located outside the City
jurisdictional limits,to the newly installed collection system.
C. Owner intends to connect his private onsite low pressure pumping station to the
newly installed collection system.
D. The City and Owner desire to set forth the following special terms and conditions
with respect to the development of the Project as provided for herein.
NOW, THEREFORE, for and in consideration of the above premises, the promises and
provisions contained herein, and for other good and valuable consideration, the receipt and
sufficiency of which are hereby acknowledged, Owner and the City agree as follows:
1. Recitals. The above Recitals are true and correct and are incorporated herein as
material provisions of this Agreement.
2. Authority. This Agreement is entered into pursuant to the Florida Municipal Home
Rule Powers Act.
3. Obligations and Commitments.
(a) Construction of Wastewater Improvements. Owner and the City agree to
the following:
(b) Owner shall construct low-pressure wastewater collection system
improvements along Bamboo Lane as shown on the project plans to conform to City standards.
(c) Upon completion of construction the Owner will dedicate the newly
constructed wastewater system to the City. The City, conditioned on the City's inspection and
acceptance of the wastewater system (including the backflow preventer referenced in subsection
(d) below) and the City's determination that the construction conforms to City standards, will
accept the dedication.
Developer's Agreement—Bamboo Lane 1
(d) The City will assume maintenance and operation responsibility of the
wastewater system within the existing Bamboo Lane right of way up to and including the 2"
grinder station point of connection, which is the City's limit of responsibility. If the property has
a boat dock, the Owner shall install a reduced pressure zone (RPZ) backflow preventer on the
private side of the water meter and submit the passing test report to the City. Proper maintenance
of the backflow preventer will remain the responsibility of the Owner and the Owner, on request
from the City, shall have the preventer tested and the test results submitted to the City. It the test
results are negative (fail to conform to City standards), the Owner shall repair or replace the
preventer within ten(10)calendar days from the date of the failed report and submit proof thereof
to the City.
(e) Reimbursement. The cost share for each property on Bamboo Lane will be
calculated as the total construction cost divided by the number of properties. As the adjacent
property owners connect to the City's wastewater systems, the City will reimburse the Owner for
the corresponding property's share of the construction cost.
(f) Prior to connection of Owner's proposed onsite low pressure pumping
station,Owner will submit design plans to the City for approval. Owner will enter into a new water
service agreement with the City and pay the capital facility charges and connection fees.
4. Time Period. This Agreement shall remain in effect for a period of three(3)years
from the date hereof Any provision of this Agreement that imposes a maintenance obligation for
Owner and its successors after expiration of this Agreement shall survive the expiration of this
Agreement.
5. Binding Effect and Successors. This Agreement shall run with the Subject
Property and the rights and the obligations under this Agreement shall benefit, burden, and bind
the successors, heirs and assigns of all parties to this Agreement. In the event of the assignment
of this Agreement, or the conveyance or transfer of the Subject Property, or any part thereof, the
Owner shall be and remain liable for performance of the obligations under this Agreement until
such time as a written release is obtained from the City, in the City's sole discretion; provided,
however, in the event all obligations under this Agreement have been completed, no such release
shall be required. The rights granted to Owner under this Agreement relate specifically to the
Subject Property and are not permitted to be transferred to any other property.
6. Validity. If any portion of this Agreement is finally determined by a court of
competent jurisdiction to be invalid, unconstitutional, unenforceable or void, the balance of the
Agreement shall continue in full force and effect.
7. Notices. Any notices required or permitted under this Agreement, and copies
thereof, shall be addressed to the City and the Owner at the addresses first appearing above, or at
such other addresses designated in writing by the party to receive notice.
Notices shall be either: (i) personally delivered (including delivery by Federal Express or
other overnight courier service) to the addresses set forth above, in which case they shall be
deemed delivered on the date of delivery; or(ii) sent by certified mail, return receipt requested, in
which case they shall be deemed delivered on the date shown on the receipt unless delivery is
Developer's Agreement—Bamboo Lane 2
refused or intentionally delayed by the addressee, in which event they shall be deemed delivered
on the date of deposit in the U.S. Mail.
8. Attorney's Fees. In any lawsuit between the parties to this Agreement arising from
this Agreement, each party shall bear their own respective attorneys' fees and costs.
9. Entire Agreement. This Agreement embodies the entire understanding of the
parties with respect to the matters specifically enumerated herein, and all negotiations,
representations, warranties and agreements made between the parties are merged herein. The
making, execution and delivery of this Agreement by all parties have been induced by no
representations, statements, warranties or agreements that are not expressed herein. There are no
further or other agreements or understandings, written or oral, in effect between or among the
parties related to the subject matter hereof.
10. Interpretation. None of the parties shall be considered the drafter of all or any
portion of this Agreement for the purposes of interpreting all or any portion of this Agreement, it
being recognized that all parties have contributed substantially and materially to the preparation
of this Agreement.
11. Local Development Approvals and Permits.Notwithstanding anything herein to
the contrary, all development of the Project shall be in compliance with all applicable federal,
state, county and municipal laws and ordinances, rules and regulations (including,but not limited
to,the City's land development regulations,zoning requirements and comprehensive plan).Unless
expressly authorized or granted herein,nothing in this Agreement shall constitute or be deemed to
constitute or require the City to issue any approval by the City of any rezoning, Comprehensive
Plan amendment, variance, special exception, final site plan, preliminary subdivision plan, final
subdivision plan, building permit, grading, storm water drainage, engineering, or any other land
use or development approval.Nor shall this Agreement be deemed to reduce, eliminate, derogate
from or otherwise adversely affect any such approvals, permissions or rights. These and any other
required City development approvals and permits shall be processed and issued by the City in
accordance with procedures with respect to same as otherwise set forth in the City's Code of
Ordinances and subject to any conditions of approval thereof. Nothing in this Agreement shall
constitute or be deemed to constitute a limitation,restriction or any other type of waiver of Owner's
right or ability to seek a rezoning, comprehensive plan amendment, variance, special exception,
site plan, preliminary subdivision plan, final subdivision plan, or any other land use or
development approval.
12. Authority. Each party represents and warrants to the other parties that it has all
necessary power and authority to enter into and consummate the terms and conditions of this
Agreement, that all acts, approvals, procedures, and similar matters required in order to authorize
this Agreement have been taken, obtained, or followed, as the case may be, and that, upon the
execution of this Agreement by all parties, this Agreement shall be valid and binding upon the
parties hereto and their successors in interest and assigns.
13. Effective Date. This Agreement shall become effective upon execution by all
parties(the "Effective Date").
Developer's Agreement-Bamboo Lane 3
14. Amendment. This Agreement may be amended, modified or cancelled by mutual
consent of the parties hereto as represented by a written document executed by the City and the
Owner.
15. Governing Law. This Agreement shall be governed by and construed in
accordance with the laws of the State of Florida. Exclusive venue in any action to construe or
enforce the provisions of this Agreement shall be in the circuit court of and for Palm Beach County,
Florida.
16. Recording.Within fourteen(14)days after the execution of this Agreement by the
parties, the City shall record this Agreement with the cost thereof to be borne by the Owner.
17. Indemnification. Owner agrees to defend, indemnify, and hold the City and
the City's its officers, employees, and agents harmless from and against any and all damages,
liabilities, claims, actions, penalties, damages, settlements, judgments, costs and expenses,
including court costs, reasonable attorney's fees, and paralegal expenses, at both the trial and
appellate levels arising directly out of Owner's construction and/or installation of the Wastewater
Improvements (collectively the "Improvements") including, without limitation, losses arising
directly out of or resulting from personal injury, death,damage to property, defects in materials or
workmanship,or a claim that the construction and/or installation of the Improvements violates any
applicable statute, ordinance, administrative order, rule or regulation or decree of any court. The
provisions of this section shall survive the completion and acceptance of the Improvements by the
City.
18. Non-Waiver of Sovereign Immunity.Nothing contained in this Agreement nor in
any instruments executed pursuant to the terms of this Agreement shall be construed as a waiver
or attempted waiver by the City of its sovereign immunity under the Constitution and laws of the
State of Florida.
19. No Third Party Beneficiaries. This Agreement does not create any third party
beneficiary rights in any individual or entity that is not a party to this Agreement.
20. Informed Execution. This Agreement is entered into voluntarily by the Owner
without duress and after full review, evaluation and consideration by the Owner. Owner is
represented by counsel, or alternatively, has been afforded an opportunity to retain counsel for
review of this Agreement.
21. Time is of the Essence. Time is hereby declared to be of the essence in the
performance of the duties and obligations of the respective parties to this Agreement.
22. Captions. The captions or paragraph headings of this Agreement are provided for
convenience only and shall not be deemed to explain,modify, amplify or aid in the interpretation,
or meaning of this Agreement.
23. Independent Parties. City and Owner are not partners and this Agreement is not a
joint venture and nothing in this Agreement shall be construed to authorize the Owner to represent
or bind the City to matters not expressly authorized or provided in this Agreement.
Developer's Agreement—Bamboo Lane 4
[SIGNATURE PAGES FOLLOW]
Developer's Agreement—Bamboo Lane 5
CITY:
CITY OF BOYNTON BEACH
ATTEST: By: 62A..t.:c '/' -4''4
J Name: LORI LAVERRIERE
By: i./. .-t10L. Title: CITY MANAGER
Name: 1} I g'
Title: G-?yi<
I c
APPROVED ' TO F•RM AND LEGALITY
For the uses a s relia e oft e City of Boynton
Beach,Florid A 1 ly
1
nO = it�
U
tea' By:
C� Name: JIM CHEROF r
eOYN0p Title: CITY ATTO'
Dated: MARCH 17, 2020
Developer's Agreement—Bamboo Lane 6
OWNER:
Owner's Name
GSL
By: Edin Mehanovic
Print Name: LatilltWar 0 s
Witness
-491Fir
ATItA.i
Print Nam u: VIM/AM/rel.
Witness
STATE OF FLORIDA
COUNTY Of--- c\.\ (LC
The foregoing instrument was executed, sworn to and acknowledged before me this
MGrc�(>
5 , 2O by �c��.� ���'l�r�c���C as v.L.) e of
c r1�im l tv� (Owner's Name). She/ Ie ,(check one) 111 is personally
known to me, or as produced a valid driver's license as iden ification.
Notary Public State of Florida
Taralyn Pratt Notary Public, State and County Aforesaid
My Commission GG 252628 Name: ' p a,
aof Expires 11/19/2022
My Commission Expires: 1- 1 S - a0
My Commission Number is: Q1(7 Dc�alGD'i;;')
Developer's Agreement—Bamboo Lane 7
EXHIBIT A
PROJECT DRAWINGS
Developer's Agreement—Bamboo Lane 8
BOYNTON BEACH UTILITIES
PALMER ROAD AND BAMBOO LANE WATER AND SEWER IMPROVEMENTS
. ,
--ir ,0--...,___, __SE-23rd-Av•----—I
•
.,..... / ;
r--
....,__ 40 •
, i I
. .
..P..... _
-, .....
vv..
9 ' Immo I
DRAWING SHEET LIST
Towramer 0-PAW 43-SEcTiom 33 / 3 SHEET 1 COVER SHEET
SHEET 2:GENERAL NOTES
4 .1..
-
SHEET 3 PLAN VIEW W
I . SHEET 4 DETAILS
_ , SHEET 5:DETAILS
- — SHEET 6 DETAILS
.Y R . i SHEET 7 DETAILS
J .
) i
1 LOCATION MAP
...-......
i
i
i
1
i -
WI 1., ....
I
. Boynton Beach Utilities G
1 124 FAST At:0LBR..ROAO BOYNTON BEACH FL 13435
O.Or on PALMER ROAD S BAMBOO
i
CARED IN C.Ot SHEET No
............
... x....t 41...0 LANE WATER&SEWER 1 OF 7
GENERAL NOTES
.[.sir r..m ar�H
ai...0":'.0'17 r w u.. a... arena....a.....ra .00. LOCATION OF UTILITIES
,n.a o..n..c • ma,u u sMOOS. 000 n 00.4 a r p0yM
wna... ,,,,,...0 r[�r Tl ITY OWNERi ANA ffMTAf 7S
ins[mw m sme m uo.a 0640u04 • .[ '' v r wa. -w. .. F`s^.avL N..r n.1540wYftt .rr 4006 0.0 n moo
c604000 00.00 0 0.0.00 06 06.0.0
:40.cor
ax. r[ lam r.. y 0.0.00000,.4 a. '�.n.os n aws - ..a„arT. s�
6T-60
...[v io.n a torrtno 0.000 00 K N n 310,000.0 CP P.nim O s n.0 n 0.oc 00. a -».n
0040( NM
..400000016 r 61401 IWIII....u EROSION CONTROL NOTES'
s
i .,.m��. ..-......*Krum 'or, 2 0.0060000 �n.o m...,oa.......n..s06 30116 9.r
! .a�..[.n �r,ar[ :grar..a D. 1 rr 0.00...
rrsra«mn r41:."Is
MU.nom
i f . 4nr .a
�r,� a~ 41.6. 01 s
Boynton Beach Utilities a
1 IN EAST YAOLgrOHT HMO BOVMON BEAOI.FL 3,1I35
0.0 In OP
PALMER ROAD 8 BAMBOO
SHEET NO
LANE WATER BSEWER =OF7
Ili i I I I
/1 .......
11 I I I
i i I I I
.oak-to I PI
r ' =
.04-
i --4.11 • ult:4413,....4
1 1 1
•••• 1 I '"J ''''1 L'''"L L'""J".'"I'''"L'''''.1
4 \,....,,, ,,,,„,- „, ....,,, .4_7 ..,,..sle_—
li 141;'''''....'4‘.•!•714,-,.'...',-..,:i4.'' 4 is= '•
V
is'' -•-!' 4 Pir =WIN 00011.a r sftwoo . UR
a(r.,;:,,...
000001.00
/00 ”, , ......... '..S...Z•11.0',.., .'''...‘...' 'ITA-- '___?3_riu -
__a.. M -.-...-.--..........—.--.-4.-..—.--.•+--A-A-.... t mal
; 111 .,;-.0.:-
, r • ——
1?:-.7.. .---'1 _
,i. dr.=
i. /14.);!, • -----......›...76,, ,......•••••• ' .....4,17.i.r'
/ 'i// 7
,
•' 7 ,
•
'
/ El — 0001004000000011011.010310000.11111601.0 1
I -
..'.:::..
S:MI:Sft.-: LEGEIND
71':: ..-OMIKIMINITI:-. C,4NAL
I 1.
•• 000000000,1000.00•64
0000=11001 ytt
/.' 180,-803] • .....,...
kerg,-'4* 00000150001.00
:001001000000.,0.. 0--- 010001010.003 WO.
zr00,100,001000.0.00 -,
I 137331 4.. f: Ur".4'''" -o-, 0100100000.5000i 010.000
'. 00.000.0
.1 •1900.
/ 40 WOW/01000140/110C
= Pomo so.4.wow ask..
• it/ 14\- aa e
,
/// rli ow 3ao /al*
0.E MOEN EMI ED 1851
r,,...:v....7
i il NOTES:
i '' Er.•••••••••.,
'Kr. I/ ,, OWL/1100(1000010,I
8231 11 001•0001100011r OM 007/01000.4.4 0'
VCRS
' , ONE STORY 1"751 'V \ :=Mei '=rag:1=":1703,74r”
000040,100(.0.0005.0014010,0100.0
1 i
I
0/00010
811
' n/00o0m01100.000..010,01.0/3070010004010.
016010.400
,-
., 4.,., Tme 1
I
I r11111M413107.
07t=Ur; I F -* .0.0 000,010031000410,10000.1010/IMIN
14......re Wow. • M.ran um...s,r mon.al....
GA INN.19.,NII. : ..faL wr swags Aware au.own.w moo
1 136751 Es
f
4--
-' rig 1161.1%-
1 1' f
' I
i
q h 1 ,
71 1 , I
I .....
PALMER ROAD AND BAMBOO LANE Boynton Beach Utilities
i WATER AND SEWER PLAN VIEW IN EAST WOOLBRIGHT ROAD BOYNTON BEA.N.SNOS .
i os LW*
........ PALMER ROAD A BAMBOO '----' 1
SHEET NO.
......... LANE WATER IL SEVVER 3 oe 7
— '
,
'4".. ...,-.17.4......,-I *FL ! l-•'IrrArgar I
cr..._,It..-- •••••-....
_jeutor
, L
_...... , 5........z..rz--- , 74„=.,......
...1=4:"' le ..'11 4.
.4.-
1.........„.„...„......, ,......
Mr..17::=
m......
I:01.27:twaj
.:11. ".
MPZITLI,.... .....
,,,..,...,..., I
i o 1 =MS Cfr.:74=I:
1 I 0
.
1 3_1.1,-•,..r• ,V ••-.em •
Prat
Eies=4:5.1-.... ' - -
) -m rz.-:-...%
• ---rs• - mo. = I i Nr- ,,, ,
ii ,...................“..........
gm el ger I WakWav" ---- - •--I:7.r=.4.74.--r,:,.---.........7----.....:4-----•--
i 1
I NSW i asin 'mv--=•••••.m.no------‘•—••,•---
1 1 1
:7-.7---z.
i .....
i1 =7....-....:..............................
I mem j ...................................................... j .-............-,-
1 , ,............................................ ".=7L.'11=-7:."'"" J •F.t.:,.....:,.--,--.--..---r4-.:•:,..---,-..---:=...-Ix=`.'t.T.:.'IT'4.1:;..
I 1•41I 1'.....'riribliagaSkTr;11=':::::::-.-..r...wm I =::"...7..7.7=7:,=..-... I
.... .....-........ .. ...
1 ................
I 'FETWai,01•1===.T.JIII.:=J:=• i:7::::===.................. I.=1::=7.:1"...."..'.".''"'"...". I :.=:::::::..7.1:*.'-.
I ••••................•......••••••,•••• I•--mutt--;mai- •••••--•-- --- I--•-••••••••••••••-:•••••-••••••=•-••••••••••=""ft I -----•-•• -.-- ---
/ ........................---.-......-..... 1:'...7.:7:-.7-72:17------------'.,:..-: I 1 -----•-••••••••-,-----
ilk ..,.........,1,........,,......,{)“.1.1.1...“700‘.. MAIO IIN 1....110.01.M.S176.841(.111RUCVM.0.404110114 OVALS , q,,,,,,,,,,,, ,,,,....,,,,,,
Ill! SAMPLIPIO POPE(11.1.4.PIE1 * ',Amu.CATE VALVE SE111110 :::rI,I.7 IP ..,,p 1,, . *"`"'""'"'"`"'"""'"'-" j.
TEPICAL OWE 1EIDAPIII INSTALLATION TYPICAL WATER/*PINCE WEITALLATION
Tow AMC WNW DETAIL 11-17. ‘T.I.I.....-. VI-29" PPP'-'
61111111M. rv.,la
...........
?T.:V..= ....Z.:Z.4..-•••••. a
,, „..........
Imam=
p==r-Y.==c1, 1#12-
......
.......,
. .
-
I i 1----Aam.ffil •,,m... isi I f ('
--
Ii—r,-----
i W..!
I I I = =:
,... 0 :v.. CILIMISILM
Ma'
1
I
1 .
i Mt......... 1 ...-..........=.................................
::.=14-r11.411111111T"..""T.*"`."'"*""""'"'"". '=""44..314r..........................,........
...
I ::=.......7.77.7"...'..... I
21...=....7,4,2413............................. .64. MR w .PATA
t i . .........•••••••••••...r••••.“•••• i ',=:::=7:::=74::::.=:'''' . Boynton Beach Utilities
1 iv t.o•ranco r.a.unowa LIEWIMEIllcatatwown al/moos.•.14, 1,1101111414.4.1tP.0.1..11.1100.61f..110110MOOADS4.1•15 i 2d ACYXPRIGHT ROAD lik,WON 8.01 FL 3305
TYPICAL PESIDEW.AL A COMMERCIAL 7.....I . IIP t...4-„, en JAW,I,
WA7f A YAM DOME VALVE CETAIL IMIP w PIP PALMER ROAD&BAMBOO
WATER SERVICE 1,1:il- !::.....,I Vac'
i ArN/PANY awn w co SHEET NICI
AIM.OP. LANE WATER&SEWER A OF?
... ...As PARA
A,'
'14 INI1Bro
. , . .1 irrl„.., ..t.,..,z j...::,re%•
'Zi•-•1*.--',FE Fr...,-Te'''.7-EFL:17 fi--1 r...'-rIF S.:.4"
___., ,=_,, \ ....................__................__......
- -1. 11•JWAJOIll W. AW SO
=MMAS w•
,A11111lArilAW......
Am Wll=
52 - :lSALSASMI
ASILICICANI rt..=,71, I .....
Or 111111
' •
1 - ;2SI=0 i t.• • i 0 114177`.7r ' =MTV' 1, e
; ••-,:z:.••:-.4 zrz.:,%TN.*BYILLIC.r....°°'''.'''''''''''''''
r--- ,Aglik i ill ti:il 00'i 1 il Li.. .1 i i ."7`.14.=••-•'.2-7•F•E•••.•-•-•--—-
1 _ =1:11111;•.T .:,II• 'F' OMR
N.LI I.m• w NAL•-••
I44•147. . ...--....................
. ........................
i I ............... CM?'".. .. .................,...............
I I ,
I .......
II ...............................
I 1 ........ tanalmscese IMIr 1 1
=miaow / ' ---•
'PPM ,.-741,174.r-41 1 "Z.T.Mv=7,4=1*.,!...,4.70..... ,...•••,............
i 1,,nrr....:,,,,:.1,....,. .................................. J '1 LANWSAFINFAL
wwwwwwwwww• I
1.......:::::::.•am E.mat mom Nom ma... 1 ..r.o.,.,w.WITZ7=nt, rAZ•erwriE4W.. i
. ....,.....Ur.T.,,,....0 C....0[1110.1MOAPP.•Ort/a5 , ' 0,,,,,,,,...,,,,,,,,,,-. ,,,,,,,,,,,,,,,,, ,,, ,,,,,,,,,,,,,,,.... .0,,,....,,,,,,,,,,,,,,,,....,,,,,,,,,,,,,,
, , FOUR,.WATER SERVICE TO.NREAD I I'TLII,LOS ''''' ''''. ‘ ."! POTARLE WATER SERVICE SINGLE SW X 3/4"TNFIC I' mm I no IFOTA&E WATER SERVICE SINGLE 611,X SM.'DM I-
-17. 1110 —I-- ..1P1
ij.LeTMF. STANDARD 2'TERI..OLOWCFR 7,-;;;•• .,...... ,... FOR SEMMES 314,I'WATER METERS 7•17 -.::: AMTER INSTALLATION DETAIL "T. MMIIEMIN• METER INSTALLATION DETAIL WA
itl _ 1
=S.W...
— --
_I_ ....
.
: rs mg .zr..471-
,
, i
i
.__,_,___ _I_X i MAMMAS ti V A:MINI
riP
H 1 i ...,,,,,,,,All 4 Egra
‘ —
I I I ........
--
I AMC IOU
• tisti"-',-*.." ..,
•,-.• 1
i I I
I .111ezem.1
i 1 — -1911tik IL -4=4--
j LWICASLIAISMI
1 1 _N\\\.„...._-m___
j , r==--•-----,--------- ..„„„, ,.,,, ----- -
,..:2..----- .721.1'"174.4o 774:77 .;
i • , ;:=:-.....--•:::_,... NSJESEENZAL Mom AIN Mr IMO
I 1 i'rr.:TAiran•CS Boynton Beach Utilities
,- 00,00“.ACH yr.'.OEMPLIABIll CP,$,F.0..frf.....10P.S 12,1 EAST MOLL:RIGHT ROAD BOYNTON BEAON FL UM
*I ,,,,.,,,, ,
1 '10, Rw,E„,,,,,,,c,,,,,,, 1-1'.rn,7 %, r TAFF..SLEEVE AND VALVE --IN \It WATER MAN LOCATING WIRE DETAIL FOR =rIL„...- LAm OWN ....
i ..'.41.1i1MLY •1-ier ez...11 INSTALLATION DETAIL W-if ,,,--. NON-META.EVE :WIT .••••••••••0. PALMER ROAD&BAMBOO
0.[Cla r•.
.1,..0211 VP. -. LANE WATER&SEWER SHEET NO.
5 OF 7
)
=:� Aa-
-1
_am =� yL
...,§51111
1 '1
L J / v 4 � ' res ase B{B���
1 i �-� (p =_cs.s=. # �41i i�rJ.
1 7: __ �. d_.... I .�.�._,
t-0 _ .... a�,�a_...,_�,. , b_c} I 1 ii_1 19 - j' �,"'_ ,.......,..m._..e.-,.._.. ._,_ I - ..__.-,W.
a..aMM.DEnano..w.TN.,1M,,.W...�.... ilii ..,.....E..,..R......R.«,�.TN�T.,,.T.o,....... lit WA.UMW..DENANNAINNMOIs.s,,,.. .�.,..
iv Khli _� TT..FORCE WINGATE VALVE �• mr
FORCE SINN GRINDER STATION YCOIRECTION N FORCE MAIM GRINDER STATION S CONNECTION B1C �� NETTING AND CUT.DETAL • _. 3 FORCE MAIN EMER NG MANHOLE
FA
LBBB
w w 4.4
=w 4 �IffIII aKIS
FAD
` / 1 -r - Li�L
P
\
IC1
�
� \ /
f -
razz_ iiimiit
m.�F _ I � ilii 14-......-
i -
_- W I 7.211 Boynton Beach Utilities
d -.,
124 EAST KOOLSOC.NT ROAD BOYNTON BEAD..FL 3430
9 .N MINN
PALMER ROAD 8 BAMBOO SHEET NO
LANE WATER B SEWER BOE 7
1
Mamas
ai —. j ._ ;_ .. 1•1101=1/..•_ ,
_ !
1 NM
•
_ _,�_ - _ _ :-_i I I ,. _ „ .4.
• WATER WJNE SEWER SEPARATION --...r.';. � HowzoNTAI SEVAMTW DETAIL �� � _.a, vERTpAL EEPARATON OFTAr—•n- -...::,re.'
,_� •p•,PREwJRE PPE VERTICAL DEFatcTwNn- =1'7.
....... STATEMENT 42• o-z,, S._—, o-20 O_, 1-0
• 333.44.44
=mow _.._ ......____-. _,.. :�-
Ma-
' pa...-17L3 �. ; '- , ...L.., _
I Is
1 -�w_ 4 MPw;.COR �.�--• ,�,.,.... . .knMORNP Boynton Beach Utilities a
1 OI o., 134 EAST NOOL88DNT ROAD SOW.BF/04 FL GS4N
a BACTERIOLOGICAL MAN GLENN,.PROCEDURE ...��N 10 TYPICAL TRENCH DETAIL -��J,7 IPOD 055NG VMEIA&SMALLERT INNTALLATON� ��v� un A/N/N
UNDER EXISTING ROADWAY.OPEN CDT ' PALMER ROAD 8 BAMBOO sNEEr NO.
€ o-A•� - amp
N AN.. LANE WATER 8 SEWER 70F7
SALE
i