Loading...
R20-009 1 RESOLUTION NO. R20-009 2 3 A RESOLUTION OF THE CITY OF BOYNTON BEACH, 4 FLORIDA, APPROVING AND AUTHORIZING THE CITY 5 MANAGER TO SIGN THE DEVELOPER'S AGREEMENT WITH 6 EDIN MECHANOVIC OF 820 BAMBOO LANE FOR THE 7 CONSTRUCTION OF WASTEWATER IMPROVEMENTS 8 WITHIN THE RIGHT-OF-WAY OF BAMBOO LANE; AND 9 PROVIDING AN EFFECTIVE DATE. 0 1 WHEREAS, Bamboo Lane is located east of Federal Highway adjacent to the 2 Intracoastal Waterway outside of the City limits in unincorporated Palm Beach County; and 3 WHEREAS, the City currently has a utility easement and an existing water main on 4 Bamboo Lane; however there are no existing sewer utilities on Bamboo Lane; and 5 WHEREAS,the lack of sewer service makes property improvements difficult for the 6 construction of new homes and additions; and 7 WHEREAS, the residents of Bamboo Lane will receive an improved level of service 8 and improved reliability and quality of service by connecting to City sewer; and 9 WHEREAS,the City Commission has determined that it is in the best interests of the .0 residents of the City to approve and authorize the City Manager to sign a Developer's 1 Agreement with Edin Mechanovic of 820 Bamboo Lane for the construction of wastewater 2 improvements within the right-of-way of Bamboo Lane. 3 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF 4 THE CITY OF BOYNTON BEACH,FLORIDA,THAT: 5 Section 1. The foregoing "Whereas" clauses are hereby ratified and confirmed as 6 being true and correct and are hereby made a specific part of this Resolution upon adoption 7 hereof. .8 Section 2. The City Commission does hereby approve and authorize the City S:\CA\RESO\Agreements\Developers Agreement with Edin Mechanovic(820 Bamboo Ln)-Reso.docx 29 Manager to sign a Developer's Agreement with Edin Mechanovic of 820 Bamboo Lane for 30 the construction of wastewater improvements within the right-of-way of Bamboo Lane,a copy 31 of which is attached hereto as Exhibit"A". 32 Section 4. This Resolution shall become effective immediately upon passage. 33 34 PASSED AND ADOPTED this(2� day of January, 2020. 35 36 CITY OF BOYNTON BEACH,FLORIDA 37 YES NO 38 39 Mayor—Steven B. Grant ✓' 40 41 Vice Mayor—Justin Katz 42 43 Commissioner—Mack McCray 44 45 Commissioner—Christina L. Romelus 46 47 Commissioner—Ty Penserga 48 49 VOTE SC 90 ATTEST: 91 92 9 3 54 Cr tal Gibson, MMC 95 City Clerk 96 97 98 (Corporate Seal) s-... . C • • S:\CA\RESO\Agreements\Developers Agreement with Edm Mechanovic(B20 Bamboo In)-Reso.docx DEVELOPER'S AGREEMENT THIS DEVELOPER'S AGREEMENT (the "Agreement") is made as of 1 wrc�. S, , 2020, by and between the CITY OF BOYNTON BEACH, a Florida municipal corporation (the "City") whose address is 3301 Quantum Boulevard, Boynton Beach, Florida 33426 and EDIN MEHANOVIC ("Owner") whose address is 820 Bamboo Lane, Delray Beach, Florida 33483. RECITALS: A. Mr. Edin Mehanovic is the owner of that certain real property(820 Bamboo Lane) as shown on the project plans; and B. Owner intends to install low-pressure wastewater collection system improvements within the right-of-way of Bamboo Lane, which is located outside the City jurisdictional limits,to the newly installed collection system. C. Owner intends to connect his private onsite low pressure pumping station to the newly installed collection system. D. The City and Owner desire to set forth the following special terms and conditions with respect to the development of the Project as provided for herein. NOW, THEREFORE, for and in consideration of the above premises, the promises and provisions contained herein, and for other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, Owner and the City agree as follows: 1. Recitals. The above Recitals are true and correct and are incorporated herein as material provisions of this Agreement. 2. Authority. This Agreement is entered into pursuant to the Florida Municipal Home Rule Powers Act. 3. Obligations and Commitments. (a) Construction of Wastewater Improvements. Owner and the City agree to the following: (b) Owner shall construct low-pressure wastewater collection system improvements along Bamboo Lane as shown on the project plans to conform to City standards. (c) Upon completion of construction the Owner will dedicate the newly constructed wastewater system to the City. The City, conditioned on the City's inspection and acceptance of the wastewater system (including the backflow preventer referenced in subsection (d) below) and the City's determination that the construction conforms to City standards, will accept the dedication. Developer's Agreement—Bamboo Lane 1 (d) The City will assume maintenance and operation responsibility of the wastewater system within the existing Bamboo Lane right of way up to and including the 2" grinder station point of connection, which is the City's limit of responsibility. If the property has a boat dock, the Owner shall install a reduced pressure zone (RPZ) backflow preventer on the private side of the water meter and submit the passing test report to the City. Proper maintenance of the backflow preventer will remain the responsibility of the Owner and the Owner, on request from the City, shall have the preventer tested and the test results submitted to the City. It the test results are negative (fail to conform to City standards), the Owner shall repair or replace the preventer within ten(10)calendar days from the date of the failed report and submit proof thereof to the City. (e) Reimbursement. The cost share for each property on Bamboo Lane will be calculated as the total construction cost divided by the number of properties. As the adjacent property owners connect to the City's wastewater systems, the City will reimburse the Owner for the corresponding property's share of the construction cost. (f) Prior to connection of Owner's proposed onsite low pressure pumping station,Owner will submit design plans to the City for approval. Owner will enter into a new water service agreement with the City and pay the capital facility charges and connection fees. 4. Time Period. This Agreement shall remain in effect for a period of three(3)years from the date hereof Any provision of this Agreement that imposes a maintenance obligation for Owner and its successors after expiration of this Agreement shall survive the expiration of this Agreement. 5. Binding Effect and Successors. This Agreement shall run with the Subject Property and the rights and the obligations under this Agreement shall benefit, burden, and bind the successors, heirs and assigns of all parties to this Agreement. In the event of the assignment of this Agreement, or the conveyance or transfer of the Subject Property, or any part thereof, the Owner shall be and remain liable for performance of the obligations under this Agreement until such time as a written release is obtained from the City, in the City's sole discretion; provided, however, in the event all obligations under this Agreement have been completed, no such release shall be required. The rights granted to Owner under this Agreement relate specifically to the Subject Property and are not permitted to be transferred to any other property. 6. Validity. If any portion of this Agreement is finally determined by a court of competent jurisdiction to be invalid, unconstitutional, unenforceable or void, the balance of the Agreement shall continue in full force and effect. 7. Notices. Any notices required or permitted under this Agreement, and copies thereof, shall be addressed to the City and the Owner at the addresses first appearing above, or at such other addresses designated in writing by the party to receive notice. Notices shall be either: (i) personally delivered (including delivery by Federal Express or other overnight courier service) to the addresses set forth above, in which case they shall be deemed delivered on the date of delivery; or(ii) sent by certified mail, return receipt requested, in which case they shall be deemed delivered on the date shown on the receipt unless delivery is Developer's Agreement—Bamboo Lane 2 refused or intentionally delayed by the addressee, in which event they shall be deemed delivered on the date of deposit in the U.S. Mail. 8. Attorney's Fees. In any lawsuit between the parties to this Agreement arising from this Agreement, each party shall bear their own respective attorneys' fees and costs. 9. Entire Agreement. This Agreement embodies the entire understanding of the parties with respect to the matters specifically enumerated herein, and all negotiations, representations, warranties and agreements made between the parties are merged herein. The making, execution and delivery of this Agreement by all parties have been induced by no representations, statements, warranties or agreements that are not expressed herein. There are no further or other agreements or understandings, written or oral, in effect between or among the parties related to the subject matter hereof. 10. Interpretation. None of the parties shall be considered the drafter of all or any portion of this Agreement for the purposes of interpreting all or any portion of this Agreement, it being recognized that all parties have contributed substantially and materially to the preparation of this Agreement. 11. Local Development Approvals and Permits.Notwithstanding anything herein to the contrary, all development of the Project shall be in compliance with all applicable federal, state, county and municipal laws and ordinances, rules and regulations (including,but not limited to,the City's land development regulations,zoning requirements and comprehensive plan).Unless expressly authorized or granted herein,nothing in this Agreement shall constitute or be deemed to constitute or require the City to issue any approval by the City of any rezoning, Comprehensive Plan amendment, variance, special exception, final site plan, preliminary subdivision plan, final subdivision plan, building permit, grading, storm water drainage, engineering, or any other land use or development approval.Nor shall this Agreement be deemed to reduce, eliminate, derogate from or otherwise adversely affect any such approvals, permissions or rights. These and any other required City development approvals and permits shall be processed and issued by the City in accordance with procedures with respect to same as otherwise set forth in the City's Code of Ordinances and subject to any conditions of approval thereof. Nothing in this Agreement shall constitute or be deemed to constitute a limitation,restriction or any other type of waiver of Owner's right or ability to seek a rezoning, comprehensive plan amendment, variance, special exception, site plan, preliminary subdivision plan, final subdivision plan, or any other land use or development approval. 12. Authority. Each party represents and warrants to the other parties that it has all necessary power and authority to enter into and consummate the terms and conditions of this Agreement, that all acts, approvals, procedures, and similar matters required in order to authorize this Agreement have been taken, obtained, or followed, as the case may be, and that, upon the execution of this Agreement by all parties, this Agreement shall be valid and binding upon the parties hereto and their successors in interest and assigns. 13. Effective Date. This Agreement shall become effective upon execution by all parties(the "Effective Date"). Developer's Agreement-Bamboo Lane 3 14. Amendment. This Agreement may be amended, modified or cancelled by mutual consent of the parties hereto as represented by a written document executed by the City and the Owner. 15. Governing Law. This Agreement shall be governed by and construed in accordance with the laws of the State of Florida. Exclusive venue in any action to construe or enforce the provisions of this Agreement shall be in the circuit court of and for Palm Beach County, Florida. 16. Recording.Within fourteen(14)days after the execution of this Agreement by the parties, the City shall record this Agreement with the cost thereof to be borne by the Owner. 17. Indemnification. Owner agrees to defend, indemnify, and hold the City and the City's its officers, employees, and agents harmless from and against any and all damages, liabilities, claims, actions, penalties, damages, settlements, judgments, costs and expenses, including court costs, reasonable attorney's fees, and paralegal expenses, at both the trial and appellate levels arising directly out of Owner's construction and/or installation of the Wastewater Improvements (collectively the "Improvements") including, without limitation, losses arising directly out of or resulting from personal injury, death,damage to property, defects in materials or workmanship,or a claim that the construction and/or installation of the Improvements violates any applicable statute, ordinance, administrative order, rule or regulation or decree of any court. The provisions of this section shall survive the completion and acceptance of the Improvements by the City. 18. Non-Waiver of Sovereign Immunity.Nothing contained in this Agreement nor in any instruments executed pursuant to the terms of this Agreement shall be construed as a waiver or attempted waiver by the City of its sovereign immunity under the Constitution and laws of the State of Florida. 19. No Third Party Beneficiaries. This Agreement does not create any third party beneficiary rights in any individual or entity that is not a party to this Agreement. 20. Informed Execution. This Agreement is entered into voluntarily by the Owner without duress and after full review, evaluation and consideration by the Owner. Owner is represented by counsel, or alternatively, has been afforded an opportunity to retain counsel for review of this Agreement. 21. Time is of the Essence. Time is hereby declared to be of the essence in the performance of the duties and obligations of the respective parties to this Agreement. 22. Captions. The captions or paragraph headings of this Agreement are provided for convenience only and shall not be deemed to explain,modify, amplify or aid in the interpretation, or meaning of this Agreement. 23. Independent Parties. City and Owner are not partners and this Agreement is not a joint venture and nothing in this Agreement shall be construed to authorize the Owner to represent or bind the City to matters not expressly authorized or provided in this Agreement. Developer's Agreement—Bamboo Lane 4 [SIGNATURE PAGES FOLLOW] Developer's Agreement—Bamboo Lane 5 CITY: CITY OF BOYNTON BEACH ATTEST: By: 62A..t.:c '/' -4''4 J Name: LORI LAVERRIERE By: i./. .-t10L. Title: CITY MANAGER Name: 1} I g' Title: G-?yi< I c APPROVED ' TO F•RM AND LEGALITY For the uses a s relia e oft e City of Boynton Beach,Florid A 1 ly 1 nO = it� U tea' By: C� Name: JIM CHEROF r eOYN0p Title: CITY ATTO' Dated: MARCH 17, 2020 Developer's Agreement—Bamboo Lane 6 OWNER: Owner's Name GSL By: Edin Mehanovic Print Name: LatilltWar 0 s Witness -491Fir ATItA.i Print Nam u: VIM/AM/rel. Witness STATE OF FLORIDA COUNTY Of--- c\.\ (LC The foregoing instrument was executed, sworn to and acknowledged before me this MGrc�(> 5 , 2O by �c��.� ���'l�r�c���C as v.L.) e of c r1�im l tv� (Owner's Name). She/ Ie ,(check one) 111 is personally known to me, or as produced a valid driver's license as iden ification. Notary Public State of Florida Taralyn Pratt Notary Public, State and County Aforesaid My Commission GG 252628 Name: ' p a, aof Expires 11/19/2022 My Commission Expires: 1- 1 S - a0 My Commission Number is: Q1(7 Dc�alGD'i;;') Developer's Agreement—Bamboo Lane 7 EXHIBIT A PROJECT DRAWINGS Developer's Agreement—Bamboo Lane 8 BOYNTON BEACH UTILITIES PALMER ROAD AND BAMBOO LANE WATER AND SEWER IMPROVEMENTS . , --ir ,0--...,___, __SE-23rd-Av•----—I • .,..... / ; r-- ....,__ 40 • , i I . . ..P..... _ -, ..... vv.. 9 ' Immo I DRAWING SHEET LIST Towramer 0-PAW 43-SEcTiom 33 / 3 SHEET 1 COVER SHEET SHEET 2:GENERAL NOTES 4 .1.. - SHEET 3 PLAN VIEW W I . SHEET 4 DETAILS _ , SHEET 5:DETAILS - — SHEET 6 DETAILS .Y R . i SHEET 7 DETAILS J . ) i 1 LOCATION MAP ...-...... i i i 1 i - WI 1., .... I . Boynton Beach Utilities G 1 124 FAST At:0LBR..ROAO BOYNTON BEACH FL 13435 O.Or on PALMER ROAD S BAMBOO i CARED IN C.Ot SHEET No ............ ... x....t 41...0 LANE WATER&SEWER 1 OF 7 GENERAL NOTES .[.sir r..m ar�H ai...0":'.0'17 r w u.. a... arena....a.....ra .00. LOCATION OF UTILITIES ,n.a o..n..c • ma,u u sMOOS. 000 n 00.4 a r p0yM wna... ,,,,,...0 r[�r Tl ITY OWNERi ANA ffMTAf 7S ins[mw m sme m uo.a 0640u04 • .[ '' v r wa. -w. .. F`s^.avL N..r n.1540wYftt .rr 4006 0.0 n moo c604000 00.00 0 0.0.00 06 06.0.0 :40.cor ax. r[ lam r.. y 0.0.00000,.4 a. '�.n.os n aws - ..a„arT. s� 6T-60 ...[v io.n a torrtno 0.000 00 K N n 310,000.0 CP P.nim O s n.0 n 0.oc 00. a -».n 0040( NM ..400000016 r 61401 IWIII....u EROSION CONTROL NOTES' s i .,.m��. ..-......*Krum 'or, 2 0.0060000 �n.o m...,oa.......n..s06 30116 9.r ! .a�..[.n �r,ar[ :grar..a D. 1 rr 0.00... rrsra«mn r41:."Is MU.nom i f . 4nr .a �r,� a~ 41.6. 01 s Boynton Beach Utilities a 1 IN EAST YAOLgrOHT HMO BOVMON BEAOI.FL 3,1I35 0.0 In OP PALMER ROAD 8 BAMBOO SHEET NO LANE WATER BSEWER =OF7 Ili i I I I /1 ....... 11 I I I i i I I I .oak-to I PI r ' = .04- i --4.11 • ult:4413,....4 1 1 1 •••• 1 I '"J ''''1 L'''"L L'""J".'"I'''"L'''''.1 4 \,....,,, ,,,,„,- „, ....,,, .4_7 ..,,..sle_— li 141;'''''....'4‘.•!•714,-,.'...',-..,:i4.'' 4 is= '• V is'' -•-!' 4 Pir =WIN 00011.a r sftwoo . UR a(r.,;:,,... 000001.00 /00 ”, , ......... '..S...Z•11.0',.., .'''...‘...' 'ITA-- '___?3_riu - __a.. M -.-...-.--..........—.--.-4.-..—.--.•+--A-A-.... t mal ; 111 .,;-.0.:- , r • —— 1?:-.7.. .---'1 _ ,i. dr.= i. /14.);!, • -----......›...76,, ,......•••••• ' .....4,17.i.r' / 'i// 7 , •' 7 , • ' / El — 0001004000000011011.010310000.11111601.0 1 I - ..'.:::.. S:MI:Sft.-: LEGEIND 71':: ..-OMIKIMINITI:-. C,4NAL I 1. •• 000000000,1000.00•64 0000=11001 ytt /.' 180,-803] • .....,... kerg,-'4* 00000150001.00 :001001000000.,0.. 0--- 010001010.003 WO. zr00,100,001000.0.00 -, I 137331 4.. f: Ur".4'''" -o-, 0100100000.5000i 010.000 '. 00.000.0 .1 •1900. / 40 WOW/01000140/110C = Pomo so.4.wow ask.. • it/ 14\- aa e , /// rli ow 3ao /al* 0.E MOEN EMI ED 1851 r,,...:v....7 i il NOTES: i '' Er.•••••••••., 'Kr. I/ ,, OWL/1100(1000010,I 8231 11 001•0001100011r OM 007/01000.4.4 0' VCRS ' , ONE STORY 1"751 'V \ :=Mei '=rag:1=":1703,74r” 000040,100(.0.0005.0014010,0100.0 1 i I 0/00010 811 ' n/00o0m01100.000..010,01.0/3070010004010. 016010.400 ,- ., 4.,., Tme 1 I I r11111M413107. 07t=Ur; I F -* .0.0 000,010031000410,10000.1010/IMIN 14......re Wow. • M.ran um...s,r mon.al.... GA INN.19.,NII. : ..faL wr swags Aware au.own.w moo 1 136751 Es f 4-- -' rig 1161.1%- 1 1' f ' I i q h 1 , 71 1 , I I ..... PALMER ROAD AND BAMBOO LANE Boynton Beach Utilities i WATER AND SEWER PLAN VIEW IN EAST WOOLBRIGHT ROAD BOYNTON BEA.N.SNOS . i os LW* ........ PALMER ROAD A BAMBOO '----' 1 SHEET NO. ......... LANE WATER IL SEVVER 3 oe 7 — ' , '4".. ...,-.17.4......,-I *FL ! l-•'IrrArgar I cr..._,It..-- •••••-.... _jeutor , L _...... , 5........z..rz--- , 74„=.,...... ...1=4:"' le ..'11 4. .4.- 1.........„.„...„......, ,...... Mr..17::= m...... I:01.27:twaj .:11. ". MPZITLI,.... ..... ,,,..,...,..., I i o 1 =MS Cfr.:74=I: 1 I 0 . 1 3_1.1,-•,..r• ,V ••-.em • Prat Eies=4:5.1-.... ' - - ) -m rz.-:-...% • ---rs• - mo. = I i Nr- ,,, , ii ,...................“.......... gm el ger I WakWav" ---- - •--I:7.r=.4.74.--r,:,.---.........7----.....:4-----•-- i 1 I NSW i asin 'mv--=•••••.m.no------‘•—••,•--- 1 1 1 :7-.7---z. i ..... i1 =7....-....:.............................. I mem j ...................................................... j .-............-,- 1 , ,............................................ ".=7L.'11=-7:."'"" J •F.t.:,.....:,.--,--.--..---r4-.:•:,..---,-..---:=...-Ix=`.'t.T.:.'IT'4.1:;.. I 1•41I 1'.....'riribliagaSkTr;11=':::::::-.-..r...wm I =::"...7..7.7=7:,=..-... I .... .....-........ .. ... 1 ................ I 'FETWai,01•1===.T.JIII.:=J:=• i:7::::===.................. I.=1::=7.:1"...."..'.".''"'"...". I :.=:::::::..7.1:*.'-. I ••••................•......••••••,•••• I•--mutt--;mai- •••••--•-- --- I--•-••••••••••••••-:•••••-••••••=•-••••••••••=""ft I -----•-•• -.-- --- / ........................---.-......-..... 1:'...7.:7:-.7-72:17------------'.,:..-: I 1 -----•-••••••••-,----- ilk ..,.........,1,........,,......,{)“.1.1.1...“700‘.. MAIO IIN 1....110.01.M.S176.841(.111RUCVM.0.404110114 OVALS , q,,,,,,,,,,,, ,,,,....,,,,,, Ill! SAMPLIPIO POPE(11.1.4.PIE1 * ',Amu.CATE VALVE SE111110 :::rI,I.7 IP ..,,p 1,, . *"`"'""'"'"`"'"""'"'-" j. TEPICAL OWE 1EIDAPIII INSTALLATION TYPICAL WATER/*PINCE WEITALLATION Tow AMC WNW DETAIL 11-17. ‘T.I.I.....-. VI-29" PPP'-' 61111111M. rv.,la ........... ?T.:V..= ....Z.:Z.4..-•••••. a ,, „.......... Imam= p==r-Y.==c1, 1#12- ...... ......., . . - I i 1----Aam.ffil •,,m... isi I f (' -- Ii—r,----- i W..! I I I = =: ,... 0 :v.. CILIMISILM Ma' 1 I 1 . i Mt......... 1 ...-..........=................................. ::.=14-r11.411111111T"..""T.*"`."'"*""""'"'"". '=""44..314r..........................,........ ... I ::=.......7.77.7"...'..... I 21...=....7,4,2413............................. .64. MR w .PATA t i . .........•••••••••••...r••••.“•••• i ',=:::=7:::=74::::.=:'''' . Boynton Beach Utilities 1 iv t.o•ranco r.a.unowa LIEWIMEIllcatatwown al/moos.•.14, 1,1101111414.4.1tP.0.1..11.1100.61f..110110MOOADS4.1•15 i 2d ACYXPRIGHT ROAD lik,WON 8.01 FL 3305 TYPICAL PESIDEW.AL A COMMERCIAL 7.....I . IIP t...4-„, en JAW,I, WA7f A YAM DOME VALVE CETAIL IMIP w PIP PALMER ROAD&BAMBOO WATER SERVICE 1,1:il- !::.....,I Vac' i ArN/PANY awn w co SHEET NICI AIM.OP. LANE WATER&SEWER A OF? ... ...As PARA A,' '14 INI1Bro . , . .1 irrl„.., ..t.,..,z j...::,re%• 'Zi•-•1*.--',FE Fr...,-Te'''.7-EFL:17 fi--1 r...'-rIF S.:.4" ___., ,=_,, \ ....................__................__...... - -1. 11•JWAJOIll W. AW SO =MMAS w• ,A11111lArilAW...... Am Wll= 52 - :lSALSASMI ASILICICANI rt..=,71, I ..... Or 111111 ' • 1 - ;2SI=0 i t.• • i 0 114177`.7r ' =MTV' 1, e ; ••-,:z:.••:-.4 zrz.:,%TN.*BYILLIC.r....°°'''.''''''''''''''' r--- ,Aglik i ill ti:il 00'i 1 il Li.. .1 i i ."7`.14.=••-•'.2-7•F•E•••.•-•-•--—- 1 _ =1:11111;•.T .:,II• 'F' OMR N.LI I.m• w NAL•-•• I44•147. . ...--.................... . ........................ i I ............... CM?'".. .. .................,............... I I , I ....... II ............................... I 1 ........ tanalmscese IMIr 1 1 =miaow / ' ---• 'PPM ,.-741,174.r-41 1 "Z.T.Mv=7,4=1*.,!...,4.70..... ,...•••,............ i 1,,nrr....:,,,,:.1,....,. .................................. J '1 LANWSAFINFAL wwwwwwwwww• I 1.......:::::::.•am E.mat mom Nom ma... 1 ..r.o.,.,w.WITZ7=nt, rAZ•erwriE4W.. i . ....,.....Ur.T.,,,....0 C....0[1110.1MOAPP.•Ort/a5 , ' 0,,,,,,,,...,,,,,,,,,,-. ,,,,,,,,,,,,,,,,, ,,, ,,,,,,,,,,,,,,,.... .0,,,....,,,,,,,,,,,,,,,,....,,,,,,,,,,,,,, , , FOUR,.WATER SERVICE TO.NREAD I I'TLII,LOS ''''' ''''. ‘ ."! POTARLE WATER SERVICE SINGLE SW X 3/4"TNFIC I' mm I no IFOTA&E WATER SERVICE SINGLE 611,X SM.'DM I- -17. 1110 —I-- ..1P1 ij.LeTMF. STANDARD 2'TERI..OLOWCFR 7,-;;;•• .,...... ,... FOR SEMMES 314,I'WATER METERS 7•17 -.::: AMTER INSTALLATION DETAIL "T. MMIIEMIN• METER INSTALLATION DETAIL WA itl _ 1 =S.W... — -- _I_ .... . : rs mg .zr..471- , , i i .__,_,___ _I_X i MAMMAS ti V A:MINI riP H 1 i ...,,,,,,,,All 4 Egra ‘ — I I I ........ -- I AMC IOU • tisti"-',-*.." .., •,-.• 1 i I I I .111ezem.1 i 1 — -1911tik IL -4=4-- j LWICASLIAISMI 1 1 _N\\\.„...._-m___ j , r==--•-----,--------- ..„„„, ,.,,, ----- - ,..:2..----- .721.1'"174.4o 774:77 .; i • , ;:=:-.....--•:::_,... NSJESEENZAL Mom AIN Mr IMO I 1 i'rr.:TAiran•CS Boynton Beach Utilities ,- 00,00“.ACH yr.'.OEMPLIABIll CP,$,F.0..frf.....10P.S 12,1 EAST MOLL:RIGHT ROAD BOYNTON BEAON FL UM *I ,,,,.,,,, , 1 '10, Rw,E„,,,,,,,c,,,,,,, 1-1'.rn,7 %, r TAFF..SLEEVE AND VALVE --IN \It WATER MAN LOCATING WIRE DETAIL FOR =rIL„...- LAm OWN .... i ..'.41.1i1MLY •1-ier ez...11 INSTALLATION DETAIL W-if ,,,--. NON-META.EVE :WIT .••••••••••0. PALMER ROAD&BAMBOO 0.[Cla r•. .1,..0211 VP. -. LANE WATER&SEWER SHEET NO. 5 OF 7 ) =:� Aa- -1 _am =� yL ...,§51111 1 '1 L J / v 4 � ' res ase B{B��� 1 i �-� (p =_cs.s=. # �41i i�rJ. 1 7: __ �. d_.... I .�.�._, t-0 _ .... a�,�a_...,_�,. , b_c} I 1 ii_1 19 - j' �,"'_ ,.......,..m._..e.-,.._.. ._,_ I - ..__.-,W. a..aMM.DEnano..w.TN.,1M,,.W...�.... ilii ..,.....E..,..R......R.«,�.TN�T.,,.T.o,....... lit WA.UMW..DENANNAINNMOIs.s,,,.. .�.,.. iv Khli _� TT..FORCE WINGATE VALVE �• mr FORCE SINN GRINDER STATION YCOIRECTION N FORCE MAIM GRINDER STATION S CONNECTION B1C �� NETTING AND CUT.DETAL • _. 3 FORCE MAIN EMER NG MANHOLE FA LBBB w w 4.4 =w 4 �IffIII aKIS FAD ` / 1 -r - Li�L P \ IC1 � � \ / f - razz_ iiimiit m.�F _ I � ilii 14-......- i - _- W I 7.211 Boynton Beach Utilities d -., 124 EAST KOOLSOC.NT ROAD BOYNTON BEAD..FL 3430 9 .N MINN PALMER ROAD 8 BAMBOO SHEET NO LANE WATER B SEWER BOE 7 1 Mamas ai —. j ._ ;_ .. 1•1101=1/..•_ , _ ! 1 NM • _ _,�_ - _ _ :-_i I I ,. _ „ .4. • WATER WJNE SEWER SEPARATION --...r.';. � HowzoNTAI SEVAMTW DETAIL �� � _.a, vERTpAL EEPARATON OFTAr—•n- -...::,re.' ,_� •p•,PREwJRE PPE VERTICAL DEFatcTwNn- =1'7. ....... STATEMENT 42• o-z,, S._—, o-20 O_, 1-0 • 333.44.44 =mow _.._ ......____-. _,.. :�- Ma- ' pa...-17L3 �. ; '- , ...L.., _ I Is 1 -�w_ 4 MPw;.COR �.�--• ,�,.,.... . .knMORNP Boynton Beach Utilities a 1 OI o., 134 EAST NOOL88DNT ROAD SOW.BF/04 FL GS4N a BACTERIOLOGICAL MAN GLENN,.PROCEDURE ...��N 10 TYPICAL TRENCH DETAIL -��J,7 IPOD 055NG VMEIA&SMALLERT INNTALLATON� ��v� un A/N/N UNDER EXISTING ROADWAY.OPEN CDT ' PALMER ROAD 8 BAMBOO sNEEr NO. € o-A•� - amp N AN.. LANE WATER 8 SEWER 70F7 SALE i